Contracts For Oct. 14, 2015

CONTRACTS

 

NAVY

 

Booz Allen Hamilton Engineering Services LLC, Linthicum, Maryland, is being awarded a $43,339,049 indefinite-delivery/indefinite-quantity contract to provide services in support of the Naval Air Warfare Center Aircraft Division’s air traffic control division.  Services to be provided include engineering; research; design; development; integration; installation; test and evaluation; fielding; analysis; maintenance; material procurements; training; and logistics services for manned and unmanned programs that utilize relative navigation systems for air traffic control, approach and landing, and refueling.  Work will be performed in Patuxent River, Maryland (60 percent); and Linthicum, Maryland (40 percent), and is expected to be completed in November 2020.  No funds will be obligated at time of award; funds will be obligated on individual task orders as they are issued.  This contract was competitively procured via an electronic request for proposals; two offers were received.  The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00421-16-D-0001).

 

The Lane Construction Corp., Cheshire, Connecticut, is being awarded an $18,638,000 modification under a firm-fixed-price contract for the exercise of Options 4 and 5. The work to be performed under these options provides for the refurbishment and replacement of existing runway electrical infrastructures such as electrical vaults, electrical manholes, handholes, conduits, wiring, runway lighting fixtures and signage and controls, lighting replacement and modernization of Airfield Lighting Phase Two at Naval Air Station Oceana.  After award of these options, the total cumulative contract value will be $85,975,000.  Work will be performed in Virginia Beach, Virginia, and is expected to be completed by March 2018.  Fiscal 2016 operation and maintenance, (Navy) contract funds in the amount of $18,638,000 will be obligated at time of award and will expire at the end of the current fiscal year.  The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-15-C-0052).

 

Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $17,599,996 not-to-exceed delivery order (550302) against a previously issued basic ordering agreement (N00019-14-G-0020).  This order provides for the procurement of retrofit modification kits and associated engineering installation services in support of the Block 3F upgrade of two F-35A aircraft for non-Department of Defense (DoD) participants.  Work will be performed in Fort Worth, Texas (90 percent); and Baltimore, Maryland (10 percent), and is expected to be completed in September 2021.  Non-DoD participant funds in the amount of $8,799,999 are being obligated at the time of award and will not expire at the end of the current fiscal year.  The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

 

Vigor Marine LLC, of Portland, Oregon, is being awarded an $11,797,840 firm-fixed-price contract for a regular overhaul/dry-docking to support the USNS Mercy (T-AH 19).  This overhaul will address numerous steel repairs; flight deck resurfacing; fuel oil, feed, and potable water tank repairs; sewage piping modifications; fire main piping replacements; annual crane inspections; and underwater hull preservation to support in the ship’s daily operations.  This contract includes six optional work items which, if exercised, would bring the cumulative value of this contract to $12,670,810.  Work will be performed in Portland, Oregon, and is expected to be completed by the end of January 2016.  Fiscal 2016 maintenance and repair funding in the amount of $11,797,840 are being obligated at the time of award and will expire at the end of the current fiscal year.  This contract was competitively procured with two offers. Military Sealift Command, Norfolk, Virginia, is the contracting activity (N32205-16-C-4400).

 

AIR FORCE

 

Herndon Products Inc., O’Fallon, Missouri, has been awarded a $9,600,000 indefinite-delivery/indefinite-quantity contract for T-38C Pacer Classic III fastener kits. Contractor will provide up to 99 T-38C fastener kits in support of Phase II of the Pacer Classic III aircraft modification program. Work will be performed at O’Fallon, Missouri, and is expected to be complete by Oct. 13, 2021. This award is the result of a competitive acquisition with three offers received. Fiscal 2014 procurement funds in the amount of $843,875 are being obligated at the time of award. Air Force Life Cycle Management Center, Hill Air Force Base, Utah, is the contracting activity (FA8211-16-D-0002).