Lee Evey holds up cross sections of concrete from the Pentagon showing numerous micro-fractures.
Pentagon Renovation Program Manager Walker Lee Evey holds up saw-cut cross sections of concrete from the Pentagon support columns showing numerous micro-fractures during a briefing on March 7, 2002. Evey reported on the progress of the reconstruction, dubbed The Phoenix Project, of the 400,000 square foot area that was structurally damaged by the terrorist attack on Sept. 11, 2001.